Having been licensed in New York since 1985, Mr. Greenwell has been responsible for surveying  and planning for numerous Rockland County projects, including a representative sampling as follows: 

Right of Way Survey, Topographic Mapping for traffic, circulation improvements in connection with Grand Slam Baseball Project on Pomona Road, Town of Ramapo.
Right of Way and Topographic Mapping for Valley Cottage Road Improvement Project , prepared for the Town of Clarkstown, 10 Maple Ave., New City, NY.
Pine Tree and Sunset Road Pump Station As-Built for the Town of Orangetown, Greenbush Road, Orangeburg, NY.
Boundary Survey of the sewage treatment plant for the RCSD #1, Route 340, Orangeburg, NY.
Boundary Survey and Topographic Mapping with Construction Stakeout and As-Built preparation for the expansion of the Medical Office Building at Good Samaritan Hospital, Route 59, Suffern, NY.
Boundary Survey and Topographic Mapping with Utility Information (per field mark-out) for Nyack College North Campus, South Nyack, NY.
Boundary Survey and Topographic Mapping, Construction Stakeout, and As-Built preparation for 63,000 square foot addition to Clarins, Olympic Drive, Orangeburg, NY.
NYS Route 303 Improvement Project for traffic light installation at Valley Cottage Shopping Center, including Right of Way Mapping, Utility Information Acquisition, and Topographic Mapping. 
Site Planning, Boundary Survey, Topographic Mapping, and Construction Stakeout for KeyMed Corporation, 99,000 square foot hi-tech facility, Corporate Drive, Orangeburg, NY.
Boundary Survey, Topographic Mapping, Site Planning, Construction Stakeout, and As-Built Surveying for Jawonio Inc., Route 45, New Hempstead, NY. 
 


Below you will find pictures taken on several of our job sites or projects